Green Valley Hospital

Green Valley Hospital

The first hospital in Green Valley is a three-story, 180,000-square-foot, state-of-the-art medical facility providing lifesaving services for over 50,000 Green Valley and surrounding community residents. The new full-service general acute care hospital was constructed on a 21.5-acre campus (12.5 acres for the hospital and 9 acres for medical office buildings and future expansion). The facility has 49 inpatient beds, 43 general medical surgical beds and six intensive care unit beds; a 14-bed emergency department with two trauma/major medical rooms; a helicopter pad; a surgical suite with four oversized rooms and two procedure rooms; pre-operative and post anesthesia care units; cardiac catheterization laboratory; MRI, CT Scan, Nuclear Medicine, Ultrasound, Fluoroscopy, Digital Xray, Mammography and DexaScan facilities; a full-service laboratory and Blood Bank; and an inpatient pharmacy.

Photos courtesy of Swaim & Associates

Project Details

Location:
Green Valley, AZ
Size:
180,000 sq. ft.
Cost:
$72 Million
SSE Services:
Preliminary Designs, Revit Service, Structural Design, Structural Specifications, System Selection Studies
Project Team:
Schneider Structural Engineers Structural Engineer
David Gibbens, P.E., Schneider Structural Engineers Project Manager
Swaim & Associates Architect
Mark Bollard, AIA Project Manager
Oakland Construction Contractor